BackBack


Another angle showing all the boiler modifications.  Luckily, I was able to make up all the cooler lines that run under the walkways from pieces of the S-2 cooler lines.  This photo also clearly shows the stock pilot truck before I removed the sideframes.  You can also clearly see how the domes were moved.  They pull up out of the S-2 boiler as separate parts (fortunately).  I filled in the voids with Squadron Putty, sanded very smooth with strips of sandpaper, and then sanded the undersides of the castings so they would smoothly mate up with the boiler in their new locations.

missing photo Click for full-size photo

backPrev Photo Next Photonext