BackBack


Early foam contours.  The entire layout base is 2" thick construction foam.  Dips below grade are made by carving out chunks of the base.  Rises in the terrain are stacked, carved chunks of foam as shown here.

missing photo Click for full-size photo

backPrev Photo Next Photonext