BackBack


Close-up showing how I made the stringers that run under the trestle trackage.  I used 3 strips of scale 2x12 lumber, with tiny 2x12 spacer blocks placed at 1.5 inch intervals.  These are all glued together and held with miniature clothespins to dry.  These two 3-strip beams are then epoxied under the track, one under each rail.  Finally, I insert the bents in place, clipping the legs to suit the terrain, and checking the track for level in all directions.

missing photo Click for full-size photo

backPrev Photo Next Photonext